Lakes Region General Hospital

LRGH 32A

DAI’s first project with LRGHealthcare which began our long-standing relationship with the hospital was to prepare a Master Facility Plan over 25 years ago.  We provided the design for the new construction of the hospital’s OR, Laboratory,  Ambulatory Surgery, Lobby, Medical Records and  Support Services. Design services also included renovations to the Emergency and Outpatient Departments, expansion of Radiology and ICU/CCU, a 24-bed Step-Down Unit adjacent to the ICU/CCU, and shell space completion for Medical Surgical beds and a new Medical Office Building. Since the…

Maine Medical Center

Engineering

DAI was selected in 2007 by Maine Medical Center to provide Engineering services to create an as-built electrical one-line diagram, and electrical facility assessment report for the former Osteopathic Hospital of Maine. This is a 200,000 square foot facility that MMC acquired in 2003. The facility came with limited existing electrical documentation and required an up-to-date, one-line diagram of the as-built conditions to aid MMC with their facility management duties. The facility assessment report included all National Electrical Code violations, fire alarm code violations and…

Redington-Fairview General Hospital – Power Plant

Power Plant

In 2005, our Engineering Division was awarded the  design and construction of a $4.8 million Power Plant for Redington-Fairview General Hospital in Skowhegan, Maine. The project created a 3,700 square foot building to house new electric service, an emergency generator, storage of 15,000 gallons of fuel, and three boilers. Electrical systems design included replacement of the existing pad mounted  service transformer with a new 2000 KVA pad mounted service transformer serving a new 480V service switchboard with a new code  compliant, 2-level GFI protected main…

Millinocket Regional Hospital

Engineering Plan

DAI was selected by Millinocket Regional Hospital to design a $2.9 Million Infrastructure Upgrade Project that encompassed replacement of two (2) non-code  compliant 480V service switchboards and associated pad mounted transformers with a new code-compliant 2-level GFI  protected main switchboard served by a new 1500 KVA pad mounted transformer, existing  250 KW Generator with a 600KW generator, and all automatic transfer switches with new 4-pole Bypass Isolation Type. This project also included the creation of  new normal and emergency electric service rooms within the existing building footprint. A…